Spares

!

METERS & LAMPS

Double-click here to change image

Meter lamp (12v) on wire

1-2 Days
QL1

Meter Lamp (Axial/Tubular)

1-2 Days
QL3

12v axial meter lamp (leads at each end).

Fits Midland 78, 48 etc.

  • 19mm x 4mm (diameter)
  • 12v
  • 0.6W

Miniature meter lamp (green)

1-2 Days
QL5

Miniature meter lamp (amber)

1-2 Days
QL6

Maycom EM27 Meter Lamp

1-2 Days
QLM

Original meter lamp for Maycom EM27 (older versions, before they were replaced with LED's) complete with orange rubber cover.

Deltaforce Original Meter lamp (10v)

1-2 Days
QLDF

Magnum S9 Channel Display (blue)

1-2 Days

Magnum S9 Frequency Display (3 digit, blue)

1-2 Days

FASTENINGS

1-2 Days

Mic Plug Screws (tiny)

1-2 Days
Q49

Pack of 50 Tiny Mic Screws

1-2 Days
Q49A

Rig Case Screws (zinc plate)

1-2 Days
Q52C

Rig Case Screws (Black)

1-2 Days
Q52B

Rig Case Screws (stainless steel)

1-2 Days
Q52S

Pack 100 Rig Screws

1-2 Days
Q52A

CONTROLS & SWITCHES

1-2 Days

Cybernet/Rotel channel change knob

1-2 Days
QKC

Magnum Deltaforce/Omegaforce Channel Change Knob

1-2 Days

Magnum S9 Channel Change Control

1-2 Days

Magnum S9 Mode Switch (5 position)

1-2 Days

Magnum S9 Band Switch

1-2 Days

Midland 38 on/off/volume control (Sold Out)

1-2 Days
QC7

Midland 98 on/off/volume control (Sold Out)

1-2 Days
QC7

Midland 98 squelch/esp control (sold out)

1-2 Days
QC6

Midland 48 Excel volume/squelch

1-2 Days
QM6

Maycom AH27 volume/squelch

1-2 Days
QC4

Maycom EM27 volume/squelch

1-2 Days
QC5

President Grant Volume/Squelch Control

1-2 Days

President Randy PTT Switch

1-2 Days
PRPTT

DNT Contact-40 slide vol/sql

1-2 Days
QD1

Short Black Slide Switch

1-2 Days
Q83